Answer

Call us for an appointment, then stop into the showroom. We welcome you to bring in or email pictures and measurements of your existing space. We offer a free estimate in the showroom, or for a nominal fee we will visit your home, take measurements, pictures and discuss the project with you. We then generate an itemized proposal for products selected at the showroom, and the labor for our professional installation.

Q: How much does it cost to remodel a bath or kitchen?

Answer

 

According to Remodeling Magazine 2018 Cost vs Value Report the national average mid range Bathroom Remodel was $18,546 with the value at sale of $12,024. A mid range Major Kitchen Remodel was $62,158 with the value at sale of $40,560.

Our average compete Kitchen remodel was $50,537 which included flooring. Appliances were supplied by our customers.

Answer

It takes about 10 man-days to remodel an existing 5' x 7' bath, but the amount of time can vary due to the intricacy of the design. A kitchen remodel can take 4 weeks or more to complete again the amount of detail work in the design will determine the time frame.

Answer

We specify products for your bath or kitchen that bring value and quality based on your budget. Please view our manufacturers link page to see what product lines we sell.

Answer

We have had clients in the past that wanted to do some of their own work. We are willing to work with you to complete your project.

Q: After I sign a contract, how long until work begins?

Answer

The lead times for the products you purchased can take up to 4 weeks to receive ( kitchen cabinets can take up to 8 weeks). We prefer to wait until all of your products are in our warehouse prior to starting your project. Typically, we can start a bath remodel in 3-5 weeks after contract signing.

Answer

We guarantee our workmanship for one year, and manufacturer's warranties apply to materials.

Q: What happens to the debris? How do you protect my home during the remodeling process?

Answer

The construction debris is typically staged in a section of your garage or other designated area. All debris is hauled away and disposed of. We recycle metals and cardboard. We protect your home by placing tarps down in the pathways, closing doors and setting up plastic barriers if needed. We ask you to remove pictures, furniture, etc that are in the pathways. The work areas are cleaned on a daily basis.

Q: I am pretty handy, and want to build the project myself. Can I just buy product from you?

Answer

Absolutely! We can assist you in design and color selection, store the materials in our warehouse and even deliver them if you wish.

Answer

We accept cash, personal checks, Mastercard, Visa, American Express and Discover. Financing is also available. On small projects, a 50% deposit is required with the remainder due upon substantial completion. On larger projects, a one third deposit is required at contract signing, one third is due when work begins and the remainder is due upon substantial completion. Substantial completion refers to situations where the project is essentially finished but a product has a defect, such as a scratched or split cabinet door, and we are waiting to receive a replacement from the manufacturer.